Over-the-road Unit Train Operations
The over-the-road unit train operations are the simplest in the plan to describe. These will be coal trains simply moving from staging yard to staging yard. There will be both Norfolk Southern and CSXT coal trains moving over the modeled territory. NS trains will originate in West Yard (Charleston) staging or K&N (Cowen) staging and move east over the railroad to Roanoke staging. CSXT trains also originate in West Yard (Rainelle) staging, but terminate in the CSXT Salem staging yard.
The NS unit trains will be 24-25 cars long between their originating point and Paint Bank, VA, on the upper level. At Paint Bank, they could potentially fill out to 35 cars for the run to Roanoke. The loads they pick up at Paint Bank will be miscellaneous loads dropped there by other mine runs (more on that later.)
All of these unit trains will be heavy enough to require a pusher from Glace to Paint Bank, and may require pushers from Paint Bank to New Castle if they add tonnage at Paint Bank.
Basically, crews will pick up these trains in staging and run them to staging.
Kanawha & Northern (K&N) Branch operations
The K&N will see a variety of coal operations. These will include:
- Power plant unit coal trains originating at the two flood loaders
- Miscellaneous coal trains with cars from the small and medium sized loaders
- Raw coal/clean coal operations between a raw coal shipper and a prep plant
The operation of power plant trains is best explained as a cycle beginning with the empties and ending with the loads.
Empty 24 or 25 car hopper trains from power plants will originate in Roanoke staging. A crew will take these trains from Roanoke to Lewisburg, where the crew will swap with a shifter crew that will take the empties to the K&N.
The shifter crew (C81 in the AM session, C83 in the PM session) will take the entire train to the flood loader at either Clearcreek or Wildcat on the K&N. Work orders will tell the crew which loader to take the empties to. Upon arrival at Clearcreek or Wildcat, the crew will pull a loaded unit train of 24-25 loads out of the loadout tracks and spot the entire empty train in the loadout tracks. Once the train of loads is assembled and empties are spotted, the shifter crew will return to Lewisburg with the loads.
At Lewisburg, the shifter crew will swap out with a mainline crew that will take the loaded train to the power plant/staging.
K&N Miscellaneous Coal Trains
Again, the easiest way to explain the process is to start with the empties.
A crew will depart Roanoke staging with an empty hopper train or a merchandise train with empty hoppers included in the consist. Upon arrival at Lewisburg, the crew of a merchandise train will set off empty hoppers that will load on the K&N. The crew of an empty hopper train will take the empty hoppers to the K&N coal/hopper yard west of Lewisburg. Empty hopper trains terminating at the K&N yard will take their power back to Lewisburg to tie up.
Mine runs will be called (C85 in the AM session, C87 in the PM session, and C89 as needed) to originate at Lewisburg with either light engines or empty hoppers that were set off by merchandise trains. These mine runs will proceed to the K&N hopper yard to pick up more empties that were left by the hopper trains. Work orders will instruct the mine run crews how many of what type of empty is to be picked up and at which mine the cars will be spotted.
The crews of C85, C87, and C89 will set off empties and pick up loads from the various medium-sized and small-sized loading operations on the K&N branches. There will be some form of randomness to this, as some loadouts may get empties but may not have any loads ready. Others may have loads for pickup but will get no empties. Still others will have loads and empties worked.
Once finished with switching the loadouts, these crews will return with all of their loads and set them off in the K&N hopper yard. The engines will then be run light to Lewisburg and the crews will go off duty.
Later in the session, a "Hill Run" crew will be called to classify the loads that are at the K&N hopper yard. Symbols for these trains will be C80 (AM session) and C82 (PM session). All of the loads from the K&N yard will be taken east. Any coal for destinations west of Lewisburg will be set off at Lewisburg for pickup by westbound trains. Any coal for destinations east of Lewisburg will be taken up the mountain from Lewisburg to Paint Bank for pickup by eastbound trains.
At Paint Bank, C80 or C82 will set off the loads in one of several storage tracks. The crews will have to block the loads for easy pickup by eastbound trains that will fill out at Paint Bank. Once the work is complete, C80 or C82 will return to Lewisburg with light engines.
Eastbound trains throughout an operating session will be instructed by the dispatcher to pick up appropriate blocks of eastbound coal at Paint Bank. From Paint Bank eastward, trains will be authorized to handle up to 35 cars as opposed to 25 cars west of Paint Bank. Preference for pickup of the blocks of coal will be for other coal trains to pick up, but some merchandise trains may be stopped as well to fill out to 35 cars.
K&N Raw Coal/Clean Coal Operations
On CR&E 1.0, we had a raw coal/clean coal operation running between a mine at Caldwell and a preparation plant on the Potts Creek Branch. This made for some interesting operations but the whole concept of shuttling raw coal and clean coal was never fully realized.
Although I have not thought out the details thoroughly yet, I would like to have a more correct representation of this type of operation on the K&N branch portion of CR&E 2.0. Either the raw coal loadout or the preparation plant would be beyond-the-basement, represented on a staging track. The other facility would be modeled on the layout.
A mine run working this type of setup should be shuttling both loads and empties around at the same time. When running to a preparation plant, for example, the train should consist of loads of raw coal as well as empties for loading of clean coal. When returning from the prep plant, the train should have loads of clean coal as well as empties to be shuttled back to the raw coal provider.
This could be an interesting operation. With proper planning, I may be able to coordinate the shuttling of empties and loads between these facilities to simplify staging.
Influences
I have several influences that have provided examples for our proposed coal train operations.
On the Norfolk Southern Pocahontas Division's Pocahontas District (ex-Norfolk &Western), mine runs and coal transfers scurry around picking up and setting off loads and empties. Loaded trains fill to tonnage at Flat Top Yard, west of Bluefield, before being pulled and pushed over the summit of Elkhorn Mountain at Bluefield. It is amazing and interesting to see the crews block and reblock seemingly identical cars loaded with coal, knowing that those look-alike cars are loaded with specific coal for specific consumers.
On the same division's Princeton-Deepwater District (ex-Virginian), "Hill Runs" of approximately 100 cars originate at the yard at Elmore, WV from coal picked up at mines. These full-length trains are pushed upgrade to a location known as Weyenoake. The first "Hill Run" ties down their cut of 100 or so cars and returns to Elmore. A second "Hill Run" originates at Elmore and doubles their 100 or or so cars together at Weyenoake as well. Finally, a "Roanoke Run" is called to take the assembled sometimes 200 car coal trains downgrade to Roanoke.
Also on the Pocahontas Division, the shuttling of raw and clean coal on the former Interstate Railroad is of interest. I still have more to learn about these operations, including the operation of trains from several mines to a huge transloader at Appalachia, VA. This transloader, now out of service, at one time blended coal brought in by train from several mines and also loaded unit trains. It both received and shipped coal, making it an interesting operation to model.
That pretty much covers what I have in mind as of now for coal train operations on the CR&E. I hope my crews are ready to shift around lots of cars loaded with black diamonds.